|
|
|
|
LEADER |
00918nam#a22002415a#4500 |
005 |
20060817094200.0 |
008 |
060817s1983####cau######b####001#0#eng#d |
001 |
BCCAB009883 |
003 |
AR-BCCAB |
245 |
1 |
0 |
|a Calibrations of instrumented steam separators to determine quality and flow distribution in an operating steam generator /
|c B. C. Teigen and J. H. Sodergren.
|
260 |
# |
# |
|a Palo Alto, Calf. :
|b Electric Power Research Institute,
|c 1983.
|
300 |
# |
# |
|a 1 v. (en varias paginaciones, algunas plegs) :
|b figuras, tablas ;
|c cm.
|
504 |
# |
# |
|a Bibliografía: p. 8-1.
|
100 |
1 |
# |
|a Teigen, B. C.
|
700 |
1 |
# |
|a Sodergren, J. H.
|
710 |
2 |
# |
|a Electric Power Research Institute.
|
080 |
# |
# |
|a 621.165
|
490 |
1 |
# |
|a EPRI. Final Report ;
|v NP 2805 RP S 139-1 (Jan. 1983)
|
040 |
# |
# |
|a arbccab
|b spa
|
500 |
# |
# |
|a Ver EPRI Reports.
|
500 |
# |
# |
|a Incluye índice.
|
942 |
# |
# |
|c BK
|
952 |
# |
# |
|2 udc
|a ARBCCAB
|b ARBCCAB
|i 10390
|o EPRI
|p 10390
|t 1
|y BK
|