|
|
|
|
LEADER |
00924Cam#a2200337#u#4500 |
001 |
OPESID007505 |
003 |
OPE |
005 |
20100519185236 |
008 |
||||||s1993 xxua | |||| ||eng d |
020 |
# |
# |
|a 0930972198
|
040 |
# |
# |
|a OPE
|b spa
|c OPE
|
092 |
# |
# |
|c 622.338.2
|l ALL
|
100 |
1 |
# |
|a Allen, Thomas O.
|
245 |
1 |
0 |
|a Production operations :
|b well completions, workover, and stimulation - I
|
250 |
# |
# |
|a 4a. ed.
|
260 |
# |
# |
|a Tulsa :
|b OGCI,
|c 1993.
|
300 |
# |
# |
|a Paginación variada :
|b il.
|
653 |
# |
# |
|a Ingeniería de reservorios
|
653 |
# |
# |
|a Producción de petróleo
|
653 |
# |
# |
|a Ensayo de pozos
|
653 |
# |
# |
|a Cementación
|
653 |
# |
# |
|a Perfilajes
|
653 |
# |
# |
|a Terminación de pozos
|
653 |
# |
# |
|a Balance de materia
|
700 |
1 |
# |
|a Roberts, Alan P.
|
866 |
0 |
# |
|a 1 ej.
|
908 |
# |
# |
|a IMP
|
929 |
# |
# |
|a DON
|
930 |
# |
# |
|a A3830
|d pre
|
952 |
# |
# |
|f DON
|w ||||||
|p OPEA3830
|a OPE
|b OPE
|o 622.338.2 ALL
|y IMP
|
999 |
# |
# |
|a ALICIA
|